The Coast Guard wants combustion analysis, calibration, and commissioning for eleven boilers at housing on Eaton's Neck in Northport, NY. Site visits are scheduled in November 2026 and must be coordinated by phone. Limited to small businesses.
Get alerts like this one More from Homeland Security, Department Of
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton�s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS � 55 � S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.
Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.
Start free