All contracts

F-35 GAU-22 and F/A-18 M61 Range Data Acquisition System

In plain English

Navy Indian Head is surveying vendors for a range data acquisition system to control and monitor F-35 and F/A-18 gun pods and test hardware. Market research only, not a solicitation; responses due November 13, 2026.

Agency: Dept Of Defense · Dept Of The Navy
Notice type: Sources Sought
Set-aside: No set-aside (open to all)
NAICS: 334515
Place of performance: Not listed
Posted: Nov 3, 2026
Response due: Nov 13, 2026
Solicitation number: N00174-26-RFPREQ-W72-0007

Open on SAM.gov

Get alerts like this one More from Dept Of Defense

Description

This announcement should not be construed as a commitment by the U.S. Government. The U.S. Navy does not intend to award a contract based on this Request for Information/Sources Sought Notice. THIS IS NOT A Request for a Proposal AND DOES NOT OBLIGATE THE U.S. GOVERNMENT TO ISSUE an RFP. This RFI is for U.S. Government planning purposes only and constitutes requests for exchange of information pursuant to FAR Part 10. The Naval Surface Warfare Center, Indian Head Division (NSWC IHD), Contracts Department, Code 02 is conducting Market Research on an F-35 GAU-22 and F/A-18 M61 Range Data Acquisition System. NSWC IHD is conducting a market survey to identify sources/vendors capable of supplying a system satisfying the following requirements: The system shall consist of an integrated test and control console, computer workstation, and junction box capable of controlling and monitoring performance data for F/A-18 A/A49A-1, A/A49A-2 and F-35 GPU-8/A, GPU-9/A gun pods. The system shall interface with and control the 20mm M61A1/A2 gun in the F/A-18 A/A49A-1 and A/A49A-2 gun system configurations and must include an integrated lane-capable Gun Control Unit (GCU). The system shall interface directly with the standard GPU-8/A and GPU-9/A Gun Systems Control Unit (GSCU) for controlling 25mm gun pods. Manual swapping of control and telemetry cables between gun platforms is acceptable provided all connectors and bulkheads are military or industrial grade and rated for high-cycle insertion and removal. The system shall replicate the baseline gun acceptance output, logging, and monitoring instrumentation utilized at production gun test facilities. The data points monitored shall include: Gun rate Trigger signal Arm signal Safing signal Steady state rate Acceleration and deceleration time Hydraulic flow rate Hydraulic pressure for supply and return Hydraulic fluid temperature Hydraulic fluid temperature Hydraulic fluid pressure Rounds fired Rounds cleared The RDAS setup shall operate strictly using existing test range utility power supplies: 115 VAC, 1-Phase, 60 Hz 300 VDC, 2.0 A 28 VDC, 30.0 A The hardware must incorporate a hardwired, fail-safe "dead-man switch" accessible to the Range Safety Officer (RSO). Releasing the switch at any point during active operations shall immediately disarm the weapon drive and inhibit fire control commands. The Contractor shall provide a complete Operational and Maintenance Manual covering the custom console, software configuration, cabling schematics, calibration procedures, safety interlocks, and troubleshooting. System Drawings & Calibration Records: Applicable factory calibration data, wiring schematics, and system interconnection drawings shall accompany final hardware delivery. The Contractor shall provide hands-on operational training, integration, and dry-fire range demonstration at the Picatinny Arsenal test range following installation. The Contractor shall live fire test the system with an F/A-18 A/A49A-1 or A/A49A-2…

Get opportunities like this one every morning.

Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.

Start free