Arnold Engineering Development Complex wants a small business to modernize the hydraulic motion system at Tunnel 9 in Silver Spring, Maryland, including design, fabrication, installation, and commissioning, on a fixed price. Bids due November 6, 2026.
Get alerts like this one More from Dept Of Defense
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: � Primary control valve (step response time of 55 ms or less) � Main actuating cylinder (working stroke of 120.5� capable of achieving a linear speed of 13 ft/s) � Hydraulic Power Unit (HPU) � Dedicated filtration and cooling "kidney" loop.
Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.
Start free