All contracts

EMU Electric Modernization Upgrade

In plain English

Navy Air Warfare Center seeks industry input on the Electric Modernization Upgrade, a small modular commercial-equipment system for the MH-60R Seahawk helicopter. Needed: a repeatable production, deployment, sustainment process, rugged packaging for air transport, and human factors improvements. This is a market survey, not a contract award.

Agency: Dept Of Defense · Dept Of The Navy
Notice type: Sources Sought
Set-aside: No set-aside (open to all)
NAICS: 541715
Place of performance: Not listed
Posted: Nov 3, 2026
Response due: Dec 1, 2026
Solicitation number: BAA-N6893625S0001-0001

Open on SAM.gov

Get alerts like this one More from Dept Of Defense

Description

The Naval Air Warfare Center Weapons Division (NAWCWD) has developed and intends to field a modular, organic capability consisting of commercial-off-the-shelf (COTS) components integrated into custom hardware for the MH-60R Seahawk helicopter. The Government has established a viable system baseline, however, a standardized, repeatable, and supportable production, deployment, and sustainment process is not yet developed. With an initial operational capability target of Q1 FY2028, the program's small scope makes traditional, large-scale support and depot-level sustainment models highly cost-prohibitive. The current ad-hoc model lacks a process with defined material flow, supply-chain management, quality control, and software deployment process. Consequently, ongoing assembly and support practices require excessive time and specialized personnel that a small team cannot realistically maintain. Furthermore, the existing packaging is not optimized for rapid global air transport, and the chassis design needs human factors optimization for installation and removal in shipboard and austere environments. As a result, these cumulative limitations reduce overall operational availability, increase the burden on forward-deployed personnel, and raise long-term lifecycle costs. This delays the Navy's critical ability to rapidly produce, transport, install, and sustain this capability worldwide. Desired Outcomes & Constraints (Submissions may be for one or all requirements) 1. ?Process Design: Production Process: An operational, production-representative process capable of producing a defined pilot lot using controlled material, assembly, programming, inspection, test, configuration-management, packaging, and acceptance processes that is executable by a small team. Deployment Process: A lightweight, practical support process that enables a small team to provision and deploy the capability with minimal specialized infrastructure. Sustainment Process: A lightweight, practical support process that enables a small team to support, maintain, repair, reconfigure, and reconstitute the capability with minimal specialized infrastructure. 2. Packaging Plan: A rugged, efficient, and reusable packaging plan compatible with Joint Modular Intermodal Containers, Pelican cases, or comparable solutions that enable rapid global air transport and protect the system and associated components during storage, shipment, and operational movement. 3. Human Factors Optimization. The project seeks modified chassis, mounts, and installation/removal processes that reduce the time, tools, personnel, and specialized equipment required to install and uninstall the system in shipboard and austere field environments. Questions: Questions should be submitted per the Submission Guidelines (section) below no later than 1600 EST (4:00 PM Eastern Standard Time) by November 09, 2026. Submission Guidelines, Evaluation, and Eligibility Requirements: Refer to BAA N6893625S0001 (https://sam.gov/workspace/…

Get opportunities like this one every morning.

Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.

Start free