All contracts › Hawaii

Remedial Action (RA) activities at the Kahuku Point Former Radio Range site

In plain English

The FAA wants a small business to clean up the Kahuku Point radio range site in Hawaii by digging up about 3,768 tons of lead and PCB contaminated soil, removing five monitoring wells, and disposing of waste. Interested small firms should submit statements of interest.

Agency: Transportation, Department Of · Federal Aviation Administration
Notice type: Presolicitation
Set-aside: Total Small Business
NAICS: 562910
Place of performance: Kahuku, HI
Posted: Oct 26, 2026
Response due: Nov 5, 2026
Solicitation number: 697DCK-27-R-00036

Open on SAM.gov

Description

The Federal Aviation Administration (FAA) contemplates issuing a Screening Information Request (SIR) for Remedial Action (RA) activities at the Kahuku Point Former Radio Range site (Site), located on the North Shore of Oahu, Hawaii. Activities include excavating 3,768 tons of soil contaminated with lead and polychlorinated biphenyls (PCBs) and disposing of the soil offsite according to applicable regulations. The purpose of this pre-solicitation is to solicit statements of interest and capabilities from Small Business Administration (SBA) small business concerns capable of performing the type of work described in this notice. The Contractor will provide all equipment, supplies, labor, transportation, and supervision necessary to perform the tasks described in the scope of work (SOW), not attached. The SOW includes, but is not limited to, the following: - The Contractor must excavate contaminated soil that was identified in reports that will be available at time of solicitation. - The Contractor must arrange for proper storage, transport, and disposal of all investigation-derived waste (IDW) generated from this RA, including necessary sampling for proper disposal. Backfilling of the excavated area will not be required. - Excavation, hauling, and disposal, quantities are as follows: Area to be excavated: 3.2 acres. Average depth of excavation: 1 foot. Average density of excavated soil excavation reports at the site): 0.73 tons per cubic yard. Total tons to be excavated: 3,768 tons. - The Contractor must decommission and remove the five (5) groundwater monitoring wells at the Site. The wells must be decommissioned according to the regulatory requirements of HDOH. The wells are very shallow and will not require the use of a drill rig for removal. - The Contractor must identify all buried utility systems where subsurface work will take place. A request for locate services with the appropriate public utility dig-line for the area must be filed within the required timeline prior to site work. - The Contractor must use GIS to generate the survey coordinates of the perimeters of the DUs to be excavated according to the attached Figure 2. The perimeters of the DUs to be excavated must be located in the field to the horizontal accuracy of 1 foot. - The Contractor is responsible for obtaining all permits and permissions and submitting all notifications required to complete this scope of work. - The Contractor is required to submit pre and post project documentation for this contract. Acceptance of Contractor submittals is subject to the approval of the FAA and other local, state, and federal regulatory agencies as applicable to the specific project. - Confirmation sampling is not required in this solicitation. Any sampling and analysis required for waste characterization purposes must be conducted according to requirements of the facility accepting the waste. In order to better understand the market for this potential requirement, the FAA requests the follow…

Get only the ones that fit you, every morning.

Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.

Start free