All contracts › Idaho

New Meadows Range Barn

In plain English

Forest Service project in New Meadows, Idaho to repair a range barn: new roof, waterline and hydrant work, lead paint removal, new siding and painting. Optional deck work is included. Limited to small businesses. Details are in the schedule attachment.

Agency: Agriculture, Department Of · Forest Service
Notice type: Combined Synopsis/Solicitation
Set-aside: Total Small Business
NAICS: 237110
Place of performance: ID
Posted: Oct 28, 2026
Response due: Nov 28, 2026
Solicitation number: 1240LT27Q0027

Open on SAM.gov

Get alerts like this one More from Agriculture, Department Of

Description

A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items

Get opportunities like this one every morning.

Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.

Start free