All contracts › North Carolina

P-271, E-130J Main Operating and Training Base, MCAS Cherry Point, NC

In plain English

Navy pre-solicitation for design and construction of an E-130J training and operating base at Cherry Point, North Carolina. It includes hangars, training buildings, road work, and utility upgrades, with about 700 days for pre-construction and more for building. Open to all; not a request for bids yet.

Agency: Dept Of Defense · Dept Of The Navy
Notice type: Presolicitation
Set-aside: No set-aside (open to all)
NAICS: 236220
Place of performance: Cherry Point, NC
Posted: Oct 28, 2026
Response due: Nov 12, 2026
Solicitation number: N4008526R0262

Open on SAM.gov

Get alerts like this one More from Dept Of Defense

Description

This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this pre-solicitation synopsis is to make notice of a proposed contract action for performing pre-construction services and construction services for P-271, E-130J Main Operating & Training Base, Marine Corps Air Station (MCAS) Cherry Point, North Carolina. PROJECT DESCRIPTION: This project constructs all operational and support facilities for E-130J Main Operating Base (MOB) and Fleet Replacement Squadron (FRS) training campus at the Marine Corps Air Station (MCAS) in Cherry Point, NC. New construction facilities include an aircraft parking apron, aircraft access apron, taxiway, three-bay aircraft maintenance hangar, training building, Mobile Support Unit operational compound, and an aircraft maintenance and ground support equipment warehouse. Renovation of existing facilities includes Building 244 for Center for Naval Aviation Technical Training (CNATT) academic and applied training functions associated with the E-130J. The Aircraft Maintenance Hangar will be a two-story building with high-bay, overhead maintenance space to support three E-130J aircraft. The hangar will be constructed as four separate buildings with expansion joints, built on deep foundations using driven precast, prestressed concrete piles. The Hangar Security Building is a single-story security guard house, outside of the PL2 security fenceline, that provides controlled access to the hangar enclave for vehicles and pedestrians. The Training Building is a predominantly single-story building, divided into four massing areas with varying roof heights. Much of the facility is low-rise, with roof heights of 16-20 feet. The Mobile Support Unit Operational Compound is a low-rise, pre-engineered long-span metal building. The Aircraft Maintenance and Ground Support Equipment (GSE) Warehouse is a low-rise, pre-engineered metal building with structural columns located along the middle of each space. The project will renovate and alter portions of Building 244 which has a total floor area of 4,356 m2 and currently supports existing CNATT functions. The project also includes significant road widening along Roosevelt Avenue and Access Roads, utility upgrades including the replacement of an electric substation, water, sewer and communications lines and a pump station. The completion time for this project is approximately 700 calendar days after award for pre-constructions services and 1,825 calendar days for construction services. P-271 is a design-bid-build project. This procurement will utilize the Early Contractor Involvement (ECI) approach and be procured in two segments: Segment I � Early Contractor Involvement Preconstruction Services and Segment II � Construction Services. Segment I � This solicitation is being advertised as "Unrestricted" for full and open competition and require both non-price (technical and past performance) and price proposals for the preconstruction ef…

Get opportunities like this one every morning.

Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.

Start free