Coast Guard wants repairs and upgrades at its Cape Disappointment station, including docks, a boat haul-out facility, dredging and rockfall slope work. Estimated value $50M to $100M. Sources sought for market research only; small businesses encouraged to respond.
10//27/2026: Update - The response due date has been changed to 15 November 2026. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER RFO FAR SUBPART 5.1, PRESOLICITATION. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. The North American Industrial Classification Code (NAICS) for this requirement is: TBD - The approximate value of Project will be $50M to $100M. Formal Sources Sought Response Due � before 3:00 pm PDT on 26 November 2026 2. Project Details and Background. The USCG Station at Cape Disappointment requires repairs, upgrades, and improvements to existing infrastructure and nearby areas to restore and retain full mission readiness. The Station is on an unstable sandbar which has experienced sediment migration into dock and adjacent waterway areas. Dock structures are failing and require repair/replacement. The vessel haul-out facility is currently inoperable due to sedimentation and requires the USCG to conduct frequent maintenance dredging. Haul-out structure is failing and requires replacement. Adjacent landscape features pose rockfall dangers above the engineering and maintenance buildings to people and property 3. Project Scope. Rockfall slope instability corrective measures: Anticipated rockfall mitigation will require corrective measures including but not limited to tree removal, rock scaling, rock dowel installation, draped mesh removal and replacement, removal and/or repair of an existing damaged ringnet fence, and installation of a midslope attenuator system. Rockfall mitigation will require difficult access techniques to reach the full height of the hazardous slope. Temporary protection of the facility and workers will be required. Repairs to damaged roadways, utilities or access pathways may be required. Repair of an existing small landslide slump along the access road is required. Final mitigation work will reduce rockfall risk to USCG personnel and facility. Waterfront structures and vessel haul-out: The waterfront structures require repairs and upgrades. Replacement of the existing floating docks is required; they will retain their current configuration (footprint) but utilize updated material specifications. Existing timber and steel piles will be either replaced, or reused with new floats, as part of th…
Yia | Contract Alerts reads every new notice and emails you the matches for your NAICS codes, location and certifications, each with a fit score. 14-day free trial.
Start free